Symbols Call
+61 3 9383 6668

Engineering

We engineer custom solutions, including square-to-round duct transitions, Y/T-shaped fittings, and bespoke honeycomb filters. Our duct saddles and seismic bracing systems ensure secure installations for complex layouts.

Engineering Excellence in Ventilation Solutions

For over 75 years, Cyclomade® has engineered AS/NZS 1668.1-compliant ventilation systems trusted by Domino’s Pizza, Nando’s, and Australian hospitals. Our Dowse Fluid Dynamics software, developed in-house since 1962, optimises airflow efficiency while reducing noise levels by 30% compared to industry averages.

Precision Engineering for Harsh Environments

Cyclomade®’s CAV46 Vertical Discharge Fan combines axial and centrifugal airflow designs to deliver 2,800–12,500 m³/h capacity at 100–750 Pa static pressure. Constructed from BlueScope GALVABOND® G2 steel with 120µm zinc coating, these fans withstand 150°C temperatures and coastal corrosion.

Key Innovations:

ISO 1940 G2.5-balanced aluminium impellers (68 dB(A) at 3m)
IP54-rated motors compliant with AS/NZS 60529
Retrofit-ready designs preserving 95% of legacy mounting patterns
Cyclo Made Aust. Pty. Ltd.

Industry-Specific Engineering

4.5-Inch Diameter Aluminum Fan Blade

Commercial Kitchens

Domino’s Pizza reduced duct cleaning frequency by 60% using our SCRUBBOX electrostatic precipitators, which capture 98% of 0.01µm grease particles.

Get a Quote
Arrow
4.5-Inch Diameter Aluminum Fan Blade

Healthcare

Royal Melbourne Hospital’s antimicrobial 316L stainless steel ducts feature Microban® coatings for ISO Class 5-8 cleanroom compliance.

Get a Quote
Arrow
4.5-Inch Diameter Aluminum Fan Blade

Industrial

ATEX Zone 2-certified fans handle explosive dust in mining sites, with 4mm steel construction and UL 181 fire dampers.

Get a Quote
Arrow
Inline Centrifugal Duct Fan - Cyclo Made

Case Studies: Engineered Impact

  • Domino’s Pizza Nationwide Retrofit

    Tasked with modernising 120+ locations, Cyclomade® engineers preserved 1947-era mounting points while upgrading to energy-efficient CAV46 fans. Post-installation smoke spill tests confirmed AS 1668.1 compliance, with automated wash cycles reducing duct cleaning costs by 60%.

    Explore Engineering Partnerships
    Arrow
  • Royal Melbourne Hospital Antimicrobial Upgrade

    We replaced outdated ductwork with 316L stainless steel systems featuring seamless welds and HEPA integration. Post-commissioning air quality tests showed 99.99% pathogen reduction, critical for oncology ward kitchens.

    Explore Engineering Partnerships
    Arrow

Trusted By Industry Leaders

Cyclo Made Aust. Pty. Ltd.

Engineering Support Services in Australia

24/7 technical hotline (1300 CYCLO1) for AS/NZS 3000 wiring guidance
CAD-driven custom designs compatible with Revit/AutoCAD
On-site commissioning including AS 1668.1 smoke spill testing